SPINNING PROJECTS:
Having finished up the huge skein from the combo spin, I decided to work on a colorway kit. I've got 2 oz of brown and 4 oz of turquoise blue on Polwarth roving to spin up. I'm aiming for a fingering weight 2-ply from these. I've started the singles and I'm ready to ply the brown skein up, and then I'll have 2 oz more of the blue to finish the singles on before those are ready to ply. I'm hoping for some spinning time this upcoming weekend to accomplish at least the first 2 oz of plying.
KNITTING/DESIGNING PROJECTS:
Woot! Lots of knitting time this weekend while I recovered from my IV therapy on Friday, and I finished the sample knit for the Sekret Knitting Project. That's done, it's blocked. I need to put some final touches on the pattern and then it can all go off to the editor. That feels awfully good to have finished.
So since that is off the needles, I've turned my focus back to the fall collection pieces I'm working on. I have the hat about 2/3rds knit and the pattern for that plus the mittens and the yarn is off at one of my stalwart testers right now. I'd like to try to finish up my version of the hat this week.
I also cast on for the smaller size of the socks in the collection and I've got the leg finished on sock #1. That pattern is also written, and that plus yarn are headed to the tester for that project. That'll be my other focus for the week, to see if I can get thru the heel and headed down the foot.
I have two projects left to tackle for the collection, and possibly one other (so maybe 3, but we'll see what my time looks like in another month). I've got the charting done for both of those, but I'm dragging my feet a little as starting an alpaca/merino blend men's-sized sweater in our current heat wave doesn't seem very fun. But if I can take care of a couple of the smaller designs, that'll be next, so I'm sure I get it finished for the photo shoot.
All for now.....
Recent Comments